Enterprise / FMCG/2025

My Hero Decoupling

HM Sampoerna

Technical due diligence and pre-decoupling analysis for HM Sampoerna, separating the My Hero module from the AYO ecosystem using C4 architectural modeling before any build work started.

Web appAPIDatabaseSystem boundary
C4 container map · placeholder
The challenge

HM Sampoerna planned to decouple the My Hero module from the AYO environment to improve modularity and long-term scalability. The complexity sat in the seams: two backoffice systems (AYO and My Hero) with overlapping ownership, and a shared iPad application used in the field by both domains.

The process
  1. 01

    Ran a joint technical assessment with Nusantara Beta Studio (NBS) as part of a tag-team engagement with Zero One Group

  2. 02

    Analyzed the existing landscape across the AYO backoffice, the My Hero backoffice, and the field iPad application

  3. 03

    Identified functional boundaries, shared services, and data dependencies across the three systems

  4. 04

    Produced C4 diagrams at Context, Container, and Component level to make the current state legible

  5. 05

    Wrote a pre-analysis of decoupling scenarios, risks, and architectural constraints

The solution

Delivered structured specifications, current-state C4 models, and a pre-analysis of feasible decoupling strategies, giving the client an architectural baseline it could execute against without guessing at the boundary line.

The trade-offs

The safest decoupling path was not the fastest one. We could have proposed a clean-slate rebuild, but the field iPad app and two backoffice systems carried live operational dependencies. We chose pre-decoupling analysis that mapped boundaries first, accepting a slower start in exchange for a plan the client could run without breaking daily operations.

Technical complexity

The hard part was deciding which couplings were accidental and which encoded business rules. C4 modeling forced the dependencies into view, but diagrams alone could not settle which duplicate data ownership was load-bearing, and that distinction could not be resolved without the maintainers in the room.

Retrospective

I would have pushed for access to the engineering teams earlier and validated the container diagram against the running system before presenting recommendations. A short working session with the maintainers would have caught assumptions that took longer to surface through documentation.

The outcomes
C4 baseline

Context, Container, and Component models documenting how the AYO ecosystem actually fits together.

Boundary map

Shared services and duplicate data ownership separated from the accidental coupling around the field iPad app.

Decoupling pre-analysis

Scenarios, risks, and constraints documented before execution, delivered jointly by Zero One Group and NBS.

Skills & methods
Enterprise ArchitectureDecouplingConsultingFMCG

Interested in working together?

I'd love to discuss bringing this same approach to your product challenges.