Enterprise / FMCG/2025

HM Sampoerna – My Hero Decoupling

HM Sampoerna

Contributed to a technical due diligence and pre-decoupling initiative for HM Sampoerna, focusing on separating the 'My Hero' module from the AYO ecosystem through system analysis and C4 architectural modeling.

01The challenge

HM Sampoerna planned to decouple the 'My Hero' module from their AYO environment to improve modularity and long-term scalability. The complexity stemmed from tightly coupled components across two backoffice systems (AYO Backoffice and My Hero Backoffice) and a shared iPad application used in the field.

02The process
  1. 01

    Conducted joint technical assessment with Nusantara Beta Studio (NBS) as part of a tag-team consulting engagement with Zero One Group

  2. 02

    Analyzed existing system landscape including AYO Backoffice, My Hero Backoffice, and iPad application

  3. 03

    Identified functional boundaries, shared services, and data dependencies across systems

  4. 04

    Produced C4 diagrams (Context, Container, and Component levels) to visualize current-state architecture

  5. 05

    Performed pre-analysis of decoupling scenarios, risks, and architectural constraints

03The solution

Delivered structured specifications, current-state C4 diagrams, and a pre-analysis outlining feasible decoupling strategies for the My Hero module, providing HM Sampoerna with a clearer architectural baseline prior to execution.

04The outcomes
01
Architecture Clarity

Documented existing system interactions and dependencies using C4 modeling

02
Readiness

Established a technical baseline to support future decoupling decisions

03
Collaboration

Effective joint consulting delivery between Zero One Group and NBS

Skills & methods
Enterprise ArchitectureDecouplingConsulting